While great
advances have been made in wastewater technology, land
drainage remains reliant on traditional techniques.
Now Klargester can offer the Ezy-Drain system, a
revolutionary new product that redefines the method
of dispersing water into soil.
Utilising recycled synthetics packed around sectional
tubes, the Ezy-Drain design offers a packaged solution
to avoid the drawbacks of using loose quarried aggregates.
The resultant benefits are an extremely lightweight system
that can be rapidly installed without the need for specialist
skills. |
|
Applications
Treatment Plants and Septic Tanks: Ezy-Drain replaces
the perforated pipework of a 'herring-bone' drainage field. Ezy-Drain's
storage and flow charecteristics typically achieve 35%
more surface area than natural aggregates, resulting in
enhanced water treatment capabilities and a reduction in
long term clogging.
Effluent Drainage: Ezy-Drain may replace traditional 'carrier'
drainage from a treatment plant to discharge point.
Seasonal Soakaways: Ezy-Drain is ideal to install
as a
'seasonal soakaway' flowing from a treatment plant. A seasonal
soakaway allows infiltration of treated effluent where
ground conditions permit or transfers effluent to an alternative
discharge point when ground conditions are unfavourable. |
|
| |
Benefits
- Speed of installation - up to 4 times faster than
traditional methods.
- Lightweight increases handling capability and reduces
Health & Safety hazards
- Single manpower installation - less labour and plant
intensive
- Minimises site waste and disposal costs
- Flexibility removes need for boxes or chambers
- Ideal for sites with restricted access
- Higher water dispersion rate than traditional methods
- Reduced site impact - minimal reinstatement and clean
up
Click here
to read more...

|
 |
Soil Porosity
To establish the overall length of a drain run required,
a soil porosity test may be necessary. The following procedure
should be adopted:
- Excavate a hole 300mm square by 300mm deep below
the proposed invert level of the land drain.
- Fill hole with water to a depth of 300mm and allow
to drain away overnight.
- Refill to a depth of 300mm and observe the time taken
to drain from 75% full to 25% full level (i.e a depth
of 150mm). Divide this time by 150mm. The answer gives
the average time in seconds (Vp) required for the water
to drop 1mm.
Repeat this exercise two more times with at least two
trial holes. Calculate the average time.
By reference to the table below, the length of drain run
required for various capacity tanks may be established.
Drainage field disposal should only be used on test values
(Vp) between 12 and 100. Where a Vp value falls outside
these limits, our technical team can advise. |
|
| |
Soil Porosity Test Data
Time
taken to fall 150mm (mins) |
Equivalent
value of Vp in sec/mm |
Overall
length of drain run required (m) |
2800
litres (4 persons) |
3800
litres (10 persons) |
4600
litres (14 persons) |
6000
litres (22 persons) |
7500
litres (30 persons) |
9000
litres (38 persons) |
| 20 |
8 |
18 |
44 |
62 |
98 |
133 |
169 |
| 30 |
12 |
27 |
67 |
93 |
147 |
200 |
253 |
| 40 |
16 |
36 |
89 |
124 |
196 |
267 |
338 |
| 60 |
24 |
53 |
133 |
187 |
293 |
400 |
507 |
| 120 |
48 |
107 |
267 |
373 |
587 |
800 |
1013 |
| 180 |
72 |
160 |
400 |
560 |
880 |
1200 |
1520 |
The table indicates typical meterage for domestic septic
tank applications, assuming a trench width of 450mm.
Approximately 20% less drainage is required for Sewage
Treatment Plants as treated effluent is of a higher standard.
For other applications and further information, please
consult Klargester. |
|
| |
Design
The Ezy-Drain comprises of sections of twin wall
perforated plastic pipe, surrounded by a synthetic aggregate,
wrapped in polyethylene netting. Each 3-metre section
is simply joined together by the use of click-fit connectors,
protected by a preformed collar.
The synthentic aggregate is manufactured from recycled
expanded polystyrene, engineered to deliver optimum performance
while consistently retaining its form.
Delivery & Installation
Ezy-Drain is entirely prefabricated and delivered in 3-metre
sections directly to site. Installation can be performed
by a single person without the need for aggregate, with
trenches only requiring backfilling prior to immediate
operation.
| Product |
Ref. |
Description |
Typical
Application |
| Ezy-Drain |
EZD-FD1233 |
300mm x 3m twin wall
perforated pipe with net outer |
Sewage
treatment plants and septic tanks |
| Ezy-Drain
Collar |
EZD-FD1206 |
Optional 300mm EPS collar surround. |
All
applications |
|
|

|
|